Titan Scheduler
Built-In Load Scheduling.No PLC. No Timer Relay. No Extra Hardware.
Two independently schedulable digital outputs per Titan meter. Configure time windows from the free EMS or mobile app. Switch loads through a simple DO → relay → contactor chain — and measure the savings on the same meter.
One meter. Two independent schedules.
Each WiFi Titan with DO can run two machine pairs or zones — for example a compressor and its aftercooler — without writing PLC logic or adding timer relays.
Two digital outputs
Independent on/off windows per DO. Align pairs that always start and stop together.
Configured from EMS / app
Set calendars on the desktop EMS or Titan mobile app. No ladder programming required.
Proof in the same tool
Shift and monthly reports show kWh before and after schedule changes on the meter itself.
The control chain
Field wiring stays familiar for panel builders. Titan provides the schedule intelligence and metering.
01
Titan DO
Scheduled digital output on the meter
02
Relay
Interposing relay for panel isolation
03
Contactor
Power switching for the load circuit
04
Load
Compressor, pump, AHU, lighting zone, …
SVG wiring diagrams from production assets can replace this schematic layout.
Use cases by industry
One Short per use case when Batch S production is complete. Until then, each card holds a labeled placeholder.
Machine pairs, compressors, and cells
Two independently schedulable digital outputs per Titan. Pair a compressor with its aftercooler — both shut during breaks without a PLC program.
Compressor + aftercooler
Problem
Both machines idle through tea breaks and shift handovers.
Solution
Shared schedule on two DOs — cut idle energy without impacting startup sequence.
Compressor + aftercooler
Short S-M1 — embed when published
Welding bay schedule
Problem
Welders and exhaust left energized between jobs.
Solution
Time windows per bay; EMS verifies actual consumption after changeover.
Welding bay schedule
Short S-M2 — embed when published
SPM / CNC cell
Problem
Coolant pumps and conveyors run outside production hours.
Solution
Map loads to DOs and align schedules with shift calendars.
SPM / CNC cell
Short S-M3 — embed when published
Why teams start with scheduling
Automated load control typically reduces idle-time energy consumption by 30–40% on compressors and similar assets that run through breaks. EMS shift reports make the waste — and the fix — visible.
See scheduler control on Titan
Request a demo of DO scheduling and EMS reports, or review the full free EMS feature set.